Bill of materials and buying for a job

A job's Bill of materials is what it takes to build it: sheet goods, banding, hardware, doors. It comes from your design software, and it tells you what to buy for this job.

Bring it in

  1. In your design software (Cabinet Vision, Mozaik, Microvellum, KCD), export the materials or parts report as a CSV file.
  2. Open the job.
  3. In Bill of materials, click Bring in a CAD report and pick the file.
  4. Check the lines. The same part on several rows is added up.
  5. Click Put these on the job.

The report needs one column for the item (Description, Material or Part) and one for how many (Qty). Columns for the part number, unit, supplier and category are used when they're there. To add something by hand, click Add a line.

What it shows. Each line is checked against your racks: how many you need, how many are on hand, and how many are short. An item matches your inventory by its part number, then by its name.

Buy what's short

  1. Click Order what's short.
  2. Click Make them. One draft purchase order is made for each vendor, tied to the job.
  3. Open Inventory, Purchase orders, check each one, and send it.

Each purchase order is dated two days before the job's production date. If one runs late, or would land after production starts, the job shows At risk on Today and on the board, with the purchase order named.

A PDF or a photo works too. Pick a PDF of the report (or a photo of a printed one) and Ed reads the materials off it. Check the quantities against the report before you click Put these on the job. A CSV is still the surest, since nothing has to be read off a page. In the sample shop, a PDF shows a sample result.

The hardware kit. When the bill of materials has hardware on it, click Print the hardware kit for a pick list: every hinge, slide and pull to pull for this job, with the rack it's on and boxes to tick when it's picked and checked.

## When the design changes

The drafter issues a new revision after the list is on the job and the orders are out. Bring the new report in the same way.

  1. Open the job.
  2. Find Bill of materials.
  3. Click Bring in a CAD report.
  4. Pick the new report.
  5. Read What changed from the list on the job. It lists what was added, what was removed and what changed, and under Purchase orders to fix it names each order that is now wrong and why.
  6. Click Put these on the job.

Nothing is saved until step 6. What you already ordered stays on its line, so Order what's short only buys the difference. A line that was removed but already ordered stays on the list, marked No longer needed, until you fix the order and remove the line. The job says how many lines have more on order than it needs.

Each report you bring in is a revision: A, B, C. Click See what changed to read any of them back. Click Ask Ed what it means and Ed looks at the job's orders and dates with you.

This is the manual that's inside the app, where every screen also has Ed to ask. Still stuck? Contact support.