The finish board

The finish board shows the booth's work in one place: what is waiting, what is curing and until when, and how many drying racks are full. It is for shops that finish in-house.

Open it

  1. Click Jobs.
  2. Click Finish, next to Board, List, Stations and Calendar.

What you see

  • Racks in use: racks holding sprayed work, out of the racks you have. Amber at 85%, red when you are over.
  • Ready to spray, Curing and Cured, still on racks. Click any number to see the jobs behind it.
  • One card for each finish. Jobs in the same finish and sheen are in the same card, so one color change covers them all.
  • An amber line for any job that has sat in finish two days or more, with the reason: a finish not sprayed yet, still curing, or cured and left on the racks.

Where the list comes from Each job's finish schedule. On the job, under Project details, click Add a finish and type where it goes, the finish, and the sheen or code. A job shows on the board once it is in production.

When you spray

  1. Find the job in its finish card.
  2. Click Sprayed.
  3. Type how many racks it is on.
  4. Check the cure time. It is filled in from the last time you sprayed that finish.
  5. Click Sprayed.

To spray several jobs in one color, click Spray all together at the top of the card.

If the spray needs more racks than are free, the box says so before you save, and says how many cured finishes can come off first.

When it comes off

  1. Wait for the chip to turn green and say Cured.
  2. Click Off the racks. The racks are free again.

When a job's last finish is off, the board tells you to move the job on.

Also

  • The Calendar view shows the day each sprayed finish is cured.
  • The job page shows where each finish stands, next to its sample.
  • The Radar lists a job that sits in finish, with the reason.

Your numbers Settings, Capacity, The finish board: how many racks you have, your usual cure time, which place in your shop is finishing, and how many days before a job counts as sitting. The same card is in Setup, under Crews and machines.

Cure times here are the ones you type. The finish maker's data sheet is the authority on how long a coating needs.

This is the manual that's inside the app, where every screen also has Ed to ask. Still stuck? Contact support.