The no-go rule
Most remakes start with something missing at template or measure, and get found at install after the stone is cut or the boxes are built. The no-go rule stops that: a stone job can't go to fabrication, and a residential cabinet job can't go to production, until the template or measure checklist from the field is complete.
It works everywhere a job moves: the stage buttons, dragging a card on the Jobs board, and Done here in the field app. The job page shows Can't go to fabrication yet and what's missing, and the Schedule counts it as not ready for that date. When the crew finishes the checklist, it clears by itself.
If you got the missing answer another way (the designer emailed the sink model), someone who manages jobs can Release anyway. ExpressFab asks why, and the job keeps the reason, who released it and what was missing. The field crew and the shop floor can't release a job.
This is the manual that's inside the app, where every screen also has Ed to ask. Still stuck? Contact support.